The most expensive destroyer ever built for the Navy has suffered an engineering problem in the Panama Canal and had to be towed to port.

U.S. Third Fleet spokesman Cmdr. Ryan Perry says a vice admiral has directed the USS Zumwalt to remain at ex-Naval Station Rodman in Panama to address the issues. The ship was built at Bath Iron Works in Maine.

Perry says the timeline for repairs is still being determined and the schedule for the ship will remain flexible to enable testing and evaluation.

Read more

The Emergency Election Sale is now live! Get 30% to 60% off our most popular products today!


Related Articles